McKesson Build-to-Suit at Riverwalk
Location:

Rock Hill, SC

Affiliate, Trinity Capital Development developed  build-to-suit distribution facility for McKesson Medical-Surgical, Inc. in Riverwalk Business Park. The 300,080 SF distribution center was built on 25 acres of land in the Rock Hill business park located at 885 Paragon Way and was completed in 2014.

Product Type: Industrial
Project Size: 300,080 SF
Architect: WGM Designs
Contractor: InterCon